Permits
New construction permit
application
234
KB
Permit fees
| LP gas storage tank (1 to 1,000 gallons) |
| $ | 55.00 | |
each |
| LP gas storage tank (over 1,000 gallons) | |
$ | 140.00 | | each |
| Decommissioning of a tank | |
$ | 130.00 | | each |
| International wildland urban interface inspection | |
$ | 130.00 | | each |
| Commercial operations permit | |
$ | 130.00 | | each |
| Fireworks/pyrotechnic displays | |
$ | 130.00 | | each |
| | | |
| | |
Full Review Permits1
| | | |
| |
| Fire suppression systems | |
| Valuation | | * |
| Standpipe systems | | |
Valuation | | * |
| Private fire hydrant systems | |
| Valuation | | * |
| Fire flow storage tanks/reservoirs | |
$ | 130.00 | | |
| Fire flow pumps | | |
Valuation | | * |
| Fire detection systems | | |
Valuation | | * |
| Liquid storage tanks | | $ |
195.00 | | |
| Compressed gas storage tanks (excluding LPG) | |
$ | 195.00 | | |
| Spray booths or dipping tanks | |
$ | 195.00 | | |
| Hazardous materials storage | |
$ | 260.00 | | |
| Industrial ovens | | $ |
130.00 | | |
| Assembly occupancy | | $ |
195.00 | | +PR |
| Event permits | | $ |
130.00 | | |
| Temporary membrane structures | |
$ | 65.00 | | ** |
| Tenant improvement | | $ |
130.00 | | |
| Plan review fee | | $ |
65.00 | | per hour |
| Plan review fee (revisions) | |
$ | 100.00 | |
per hour |
1 All permits are subject to a $35.00 issuance fee.
* Based on actual valuation of the project (contract price) and
assessed in accordance with the currently adopted permit fee table.
** In addition to Event Permit Fee (if applicable).
Special event permits
A special event is defined by
the International Fire Code as a carnival, fair, circus, exhibit or
trade show, or any other type of public exhibition. These events
shall require a permit from the Fire Marshal's Office, in addition to
any other required county permits.
A Fire Marshal's Event/Assembly permits application must meet the
following requirements:
- A completed application.
- A site plan.
- Indoor events must include a floor plan.
- Submitted to the Fire Marshal's office a minimum of 14 day
prior to the scheduled event.
The Fire Marshal Event/Assembly permits application is an
application for 2 separate permits:
- Fire Marshal Event Permit
- Fire Marshal Assembly Occupancy Permit
|