The Board of County Commissioners are being asked to set a public hearing to consider adding a 0.11 mile long segment of Hyak Drive East, located in the Section 15, T 22N, R11E, W.M. This segment begins at the intersection with Rampart Drive and ends at the 90 degree right turn into the Snoqualmie Pass Utility District's water and wastewater maintenance area.
This section of Hyak Drive East was not included in the Hyak Road Improvement District, but was constructed according to County road standards at the same time the balance of the Hyak roads were constructed, by the same contractor. The County now wishes to construct a shop building on land being donated by the Snoqualmie Pass Utility District adjacent to their wastewater treatment lagoon.
For more information, contact Public Works