Disclaimer: This web site is provided for informational purposes
only. Although every effort has been made to provide accuracy, all
information and resources shown are not official. Neither Kittitas
County nor any of its agencies, officials or employees guarantees
the accuracy of any information on this web site. Reliance upon the
information contained on or accessed through this web site is
entirely at your own risk. Kittitas County reserves the right to
make changes without notice. The official hard copy is available in the Commissioners' office.
15A.01.010 Purpose and authority. It is the purpose of this title to effectively and efficiently administer applications for land use development activities by combining environmental review process, both procedural and substantive, with the procedure for review of project permits.
Each local government planning under
RCW 36.70A.040 shall establish a permit review process that provides for the integrated and consolidated review and decision on two or more project permits relating to a proposed project action, including a single application review and approval process covering part of or all project permits requested by an applicant for all or part of a project action, and a designated permit coordinator.
When a project permit application is filed, the project review process
should include land use, environmental, public, and governmental review so
that documents prepared under different requirements can be reviewed
together by the public and other agencies, in one project review process. In
the event of inconsistencies within county code pertaining to such
processing, this title shall control. (Ord. 2000-07; Ord. 98-10, 1998)
15A.01.020 Administrative and enforcement officers.
It shall be the duty of the Community Development Services director or such other persons designated by the county commissioners to administer the provisions of this title.
The prosecuting attorney may institute any necessary legal proceedings to enforce the provisions of this title.
The county sheriff and his authorized representatives shall have the
authority to enforce the provisions of this title. (Ord. 2007-22, 2007; Ord.
2000-07; Ord. 98-10, 1998)
15A.01.030 Applicability. The provisions of this title shall apply to all land use permits under KCC Titles
15, 15A, 16,
17, and 17A, county
shoreline master program, and to any related regulation or any other ordinance
or law implementing these provisions. In the event of conflict with the current
county code, this title shall control. (Ord. 2000-07; Ord. 98-10, 1998)
15A.01.040 Roles and responsibilities.
The regulation of land development is a cooperative activity including many different elected and appointed boards and county staff. The specific responsibilities of these bodies is set forth below and outlined in
Table A at the end of this title.
Applicant. An applicant is expected to read and understand the county comprehensive plan and code and be prepared to fulfill the obligations placed on the applicant. Pre-application conferences are available to anyone who wishes to discuss such obligations prior to submittal.
Community Development Services Director.
The Community Development Services Director (CDS Director) is responsible for the administration of portions of
KCC Title 15, Environmental Policy, Title 15A, Project Permit Application Process,
Title 16, Subdivisions, Title 17, Zoning,
Title 17A, Critical Areas, and the shoreline master program.
Upon request or as determined necessary, the CDS Director shall interpret the meaning or application of the provisions of said titles and issue a written administrative interpretation. Requests for interpretation shall be written and shall concisely identify the issue and desired interpretation.
Administrative land use decisions on certain zoning conditional uses, and variances from the standards and dimensional regulations of the zoning code,
KCC Title 17, such as setback and yard restrictions.
Board of County Commissioners. In addition to its legislative responsibilities under
KCC Title 15B, the board shall review and act on the following subjects pursuant to this title:
Recommendations of the Hearing Examiner or Planning Commission. Decision-making process by the board shall consist of a public meeting or meetings wherein the board reviews the written record transmitted from the
Hearing Examiner for Quasi judicial matters and the Planning Commission
for Legislative matters and issues a written decision in resolution or ordinance form. During such meeting(s), appropriate county staff will present the record to the board, providing information as necessary to ensure county code compliance. No new comment or information will be allowed by the board during the decision-making process.
Appeals of administrative SEPA actions regarding an action without an underlying permit.
Open record appeals of administrative SEPA actions when the board of county commissioners makes decision on, or hears appeals of, the underlying action.
Closed record appeals of administrative SEPA actions, exclusive of
Hearing Examiner SEPA appeal decisions.
Hearing Examiner. The Hearing Examiner shall review and make recommendations to the board of county commissioners on the following applications and subjects:
All Quasi judicial review processes including:
applications for preliminary plats
Rezone applications.
Other actions requested or remanded by the board of county commissioners.
Development agreements.
Open record appeals of administrative SEPA actions when the Hearing
Examiner makes decision on, or hears appeals of, the underlying action.
Board of Adjustment. The board of adjustment shall review and act on the following subjects:
Appeals of administrative determinations on certain zoning conditional uses, and variances from the standards and dimensional regulations of the zoning code,
KCC Title 17, such as setback and yard restrictions.
Conditional use permits pursuant to the zoning code,
KCC Title 17.
Shoreline permits, including variances, conditional uses, and shoreline substantial development permits pursuant to the shoreline master program.
Open record appeals of administrative SEPA actions when the board of
adjustment makes decision on, or hears appeals of, the underlying
action. (Ord. 2007-37, 2007; Ord. 2007-22, 2007; Ord. 2000-07; Ord.
9810, 1998)
15A.01.050 Severability.
If any chapter, section, subsection, sentence, clause, phrase, part or portion of this title is for any reason held to be invalid or unconstitutional by any court of competent jurisdiction, such decision shall not affect the validity of the remaining portions of this title or the application of the provisions to other persons or circumstances. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.010 Generally. Certain terms and words used in this title are defined in the following
sections. Words used in the present tense include the future; words in the
singular number include the plural number; and words in the plural number
include the singular number; the word "building" includes the word "structure,"
and the word "shall" is mandatory and not directory. (Ord. 2000-07; Ord. 98-10,
1998)
15A.02.020 Administrator. "Administrator" means the county planning director or his/her designee.
(Ord. 2000-07; Ord. 98-10, 1998)
15A.02.030 Closed record appeal. "Closed record appeal" means an administrative appeal on the record to a
local government body or officer, including the legislative body, following an
open record hearing on a project permit application when the appeal is on the
record with no or limited new evidence or information allowed to be submitted
and only appeal argument allowed. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.040 Consistency. "Consistency" means, including but not limited to, compliance,
conformity and consistency, and refers to performance in accordance with
Kittitas County comprehensive plan and development regulations. (Ord. 2000-07;
Ord. 98-10, 1998)
15A.02.050 Land use decision. "Land use decision" means a final determination by a local jurisdiction's body or officer with the highest level of authority to make the determination, including those with authority to hear appeals, on:
An application for a project permit or other governmental approval required by law before real property may be improved, developed, modified, subdivided, or used, but excluding applications for permits or approvals to use, vacate, or transfer streets, parks, and similar types of public property, excluding applications for legislative approvals such as area-wide rezones and annexations, and excluding applications for business licenses;
An interpretive or declaratory decision regarding the application to a specific property of zoning or other ordinance or rules regulating the improvement, development, modification, maintenance, or use of real property; and
The enforcement by a local jurisdiction of ordinances regulating the
improvement, development, modification, maintenance, or use of real
property. (Ord. 2000-07; Ord. 9810, 1998)
15A.02.060 Open record hearing. "Open record hearing" means a hearing by a single hearing body or
officer, authorized by the local government to conduct such hearings, that
creates the local government's record through testimony and submission of
evidence and information under procedures prescribed by the local government by
ordinance or resolution. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.070 Person. "Person" means an individual, partnership, corporation, association,
public or private organization, or government entity or agency. (Ord. 2000-07;
Ord. 98-10, 1998)
15A.02.080 Project permit or project permit application. "Project permit" or "project permit application" means any land use or
environmental permit or license required from a local government for a project
action, including but not limited to building permits, subdivisions, binding
site plans, planned unit developments, conditional uses, shoreline substantial
development permits, site plan review, permits or approvals required by critical
areas ordinances, site-specific rezones authorized by a comprehensive plan or
subarea plan, but excluding the adoption or amendment of a comprehensive plan,
subarea plan, or development regulations. (Ord. 2000-07; Ord. 98-10, 1998)
15A.02.090 Public meeting. "Public meeting" means an informal meeting, hearing, workshop, or other
public gathering of people to obtain comments from the public or other agencies
on a proposed project permit prior to the local government's decision. A public
meeting may include, but is not limited to, a design review or architectural
control board meeting, a special review district or community council meeting,
or a scoping meeting on a draft environmental impact statement. A public meeting
does not include an open record hearing. The proceedings at a public meeting may
be recorded and a report or recommendation may be included in the local
government's project permit application file. (Ord. 2000-07; Ord. 98-10, 1998)
Sections 15A.03.010 Complete application defined. 15A.03.020 Preapplication conference. 15A.03.030 Application and accompanying data. 15A.03.040 Determination of complete application. 15A.03.050 Fee schedule. 15A.03.060 Notice of application. 15A.03.070 Specific procedures for permit review. 15A.03.080 Projects exempt from the provisions of notice of application. 15A.03.090 Review actions on project permit applications. 15A.03.100 Criteria for review of all project actions. 15A.03.110 Posting sites.
15A.03.010 Complete application defined. The definition of a complete project permit application is defined in
the relevant section of the zoning code, subdivision code, or, if applicable,
development agreement adopted pursuant to this title. (Ord. 2000-07; Ord. 98-10,
1998)
15A.03.020 Preapplication conference. A preapplication conference is offered to all interested potential applicants. Applicants are encouraged but not required to request this conference
except in the case of a Performance Based Cluster Development where3 a
preapplication conference is required.
Prior to formal submittal of a project permit application, one or more optional conferences with appropriate county department representatives and other public agency representatives may be requested by the applicant. The date, time and place of such conferences shall be at the mutual agreement of the participants.
Such conferences are intended as informal discussion and review of possible applications to assist the possible applicant in discovery of appropriate county regulations, standards, application formats and review processes that would be required of a project.
Such conferences are not publicized and the public is not permitted to attend in order that a potential applicant's interests be protected. (Ord.
2007-22, 2007; Ord.
2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
Written application for the approval of the following project activities: zoning variance; zoning conditional use; short plat, long plat or subdivision; shorelines substantial development/conditional use, master planned resort; and site-specific rezone shall be filed in complete form in the
Community Development Services office upon forms prescribed for that purpose by the administrator.
The written application shall be accompanied by a site plan showing the dimensions and arrangement of the proposed development or changes including all proposed land uses and structures; points of access, roads and parking areas; septic tank and drainfield and replacement areas; areas to be cut or filled; and natural features such as contours, streams, gullies, cliffs, etc. The administrator may require other drawings, topographic surveys, photographs, or other material essential to an understanding of the proposed use and its relationship to the surrounding properties.
Applications for project permits shall be signed by the owner(s) of the property.
The applicant shall furnish a list of the names and addresses of all persons owning real property located within
500 feet from and parallel to the boundaries of the proposed activities and such contiguous area under the legal control of the applicant.
Within 28 days after receiving a project permit application, the local permitting agency shall mail or provide in person a written determination to the applicant, stating either:
That the application is complete; or
That the application is incomplete and what is necessary to make the application complete. An incomplete application shall expire after 180 calendar days unless the requested supplemental information is submitted in complete form.
To the extent known by the permitting agency, the permitting agency shall identify other agencies of local, state or federal governments that may have jurisdiction over some aspect of the application.
A project permit application is complete for the purposes of this title when it meets the procedural submission requirements of Kittitas County and is sufficient for continued processing even though additional information may be required or project modifications may be undertaken subsequently. The determination of completeness shall not preclude Kittitas County from requesting additional information or studies either at the time of the notice of completeness or subsequently if new information is required or substantial changes in the proposed action occur.
Within 14 days after an applicant has submitted to the permitting agency additional information identified by the permitting agency as being necessary for a complete application, the permitting agency shall notify the applicant whether the application is complete or what additional information is necessary. In determining the number of days that have elapsed after Kittitas County has notified the applicant that the application is complete, the following periods shall be excluded:
Any period during which the applicant has been requested by Kittitas County to correct plans, perform required studies, or provide additional required information. The period shall be calculated from the date Kittitas County notifies the applicant of the need for the additional information until the earlier of the date Kittitas County determined whether the additional information satisfies the request for information or 14 days after the date the information has been provided to Kittitas County.
If Kittitas County determines that the additional information submitted by the applicant is insufficient, it shall notify the applicant of the continued deficiencies and the procedures under subsection (D)(1)(a) of this section shall apply as if a new request for studies has been made.
Any period during which an environmental impact statement is being prepared following a determination of significance pursuant to Chapter
43.21C RCW, if Kittitas County and the applicant in writing agree to a time period for completion of an environmental impact statement.
Any period of administrative appeals of project permits, if an open record hearing or a closed record appeal, or both, are allowed. The time period to consider and decide such appeals shall not exceed:
Ninety days for an open record appeal hearing;
Sixty days for a closed record appeal; and
The parties to an appeal may agree to extend these time periods.
Any extension of time mutually agreed upon by the applicant and Kittitas County.
These time limits do not apply to a project permit application, if the project:
Requires an amendment to the comprehensive plan or a development regulation;
Requires approval of a new fully contained community as provided in
RCW 36.70A.350, a master planned resort as provided in
RCW 36.70A.360, or the siting of an essential public facility as provided in
RCW 36.70A.200;
Is substantially revised by the applicant, in which case the time period shall start from the date at which the revised project application is determined to be complete.
If Kittitas County is unable to issue its final decision within the time limits provided, it shall provide written notice of this fact to the applicant. The notice shall include a statement of reasons why the time limits have not been met and an estimated date of issuance of the notice of final decision.
Applications shall be void if they remain incomplete for more than 180 days.
This section shall apply to project permit applications filed on or
after the date of adoption of this title. (Ord. 2000-07; Ord. 9810,
1998)
15A.03.050 Fee schedule. The fees for such application processes related to this title shall be
established annually by resolution and may be obtained from the Community
Development Services department. Fees shall be payable to Kittitas County and
shall not be refundable in any case. (Ord. 2007-22, 2007; Ord. 2000-07; Ord.
98-10, 1998)
15A.03.060 Notice of application. Kittitas County shall provide a notice of application to the public and the departments and agencies with jurisdiction. If Kittitas County has made a SEPA determination of significance under Chapter
43.21C RCW concurrently with the notice of application, the notice of application shall be combined with the determination of significance and scoping notice. Nothing in this subsection prevents a determination of significance and scoping notice from being issued prior to a notice of application.
The notice of application shall be provided within 14 days after the determination of completeness in the following method:
Publishing notice, including at least the project location in other than a legal description, brief description of project, type of permit(s) required, comment period dates, and location where the complete application may be reviewed in the newspaper of general circulation in the general area where the proposal is located or in a local land use newsletter published by Kittitas County.
Additional legal notice may be published for development applications located in the upper county in newspapers
published at least weekly, in addition to the legal publishing requirement in the official county paper of
record.
Notifying public or private groups with known interest in a certain proposal or in the type of proposal being considered.
Mailing to adjacent landowners. Adjacent landowners are the owners of real property, as shown by the records of the county assessor, located within
500 feet of any portion of the boundary of the proposal's tax parcel or lot of record (real property). If the owner of the real property which is proposed for activity owns another parcel or parcels of real property which lie adjacent to the real property proposed for activity, notice shall be given to owners of real property located within
500 feet of any portion of the boundaries of such adjacently located parcels of real property owned by the owner of the real property proposed for activity.
The notice of application shall include the following:
The date of initial application, the date of the notice of completion for the application, and the date of the notice of application.
A description of the proposed project action and a list of the project permits included in the application and, if applicable, a list of any additional studies requested to complete the application.
The identification of other permits not included in the application to the extent known by Kittitas County.
The identification of existing environmental documents that evaluate the proposed project.
The location where the application and any studies can be reviewed.
A statement of the public comment period, which shall be not less than 14 nor more than 30 days following the date of the notice of application. This comment period shall be pursuant to
Table A at the end of this title.
Statement of the right of any person to comment on the application, receive notice of and participate in any hearings, request a copy of the decision once made, and any appeal rights.
Kittitas County will accept public comments at any time prior to the closing of the public comment period of the specific application.
The date, time, place and type of hearing, if applicable and scheduled at the date of notice of the application.
A statement of the preliminary determination, if one has been made at the time of notice, of those development regulations that will be used for project mitigation and of consistency.
Identify the designated permit coordinator.
Any other information determined appropriate by Kittitas County.
If the administrator has a reasonable basis for determining significant adverse environmental impacts are unlikely (pursuant to
Chapter 15.04 KCC, SEPA Regulations) for a proposal, the notice of application comment period will suffice for purposes of compliance with Chapter
197-11 WAC, and a second comment period after issuance of the SEPA threshold determination will not be required; provided, the notice of application includes the following:
A statement indicating that the county expects to issue a DNS for the proposal; and
A statement indicating that the optional DNS process is being used, and that this may be the only opportunity to comment on the environmental impacts of the proposal; and
A statement indicating that the proposal may include mitigation measures under applicable codes, and the project review process may incorporate or require mitigation measures regardless of whether an EIS is prepared; and
A statement indicating that a copy of the subsequent threshold determination for the specific proposal may be obtained upon request.
A notice of application shall not be required for project permits that are categorically exempt under Chapter
43.21C RCW (SEPA), unless a public comment period is required or for projects identified in
KCC 15A.03.080, Projects exempt from the
provisions of notice of application. (Ord. 2007-22, 2007; Ord. 2000-07; Ord.
98-10, 1998)
15A.03.070 Specific procedures for permit review. The specific procedures for individual permit applications and independent administrative actions, including public comment period, public hearing, decision-making body, and appeals, are established pursuant to
Table A at the end of this title. (Ord. 2000-07; Ord.
98-10, 1998)
15A.03.080 Projects exempt from the provisions of notice of application. The following project proposals and land use actions shall be exempt from the provisions of notification when not associated with a larger, overall project. These projects allow an abbreviated application format and do not involve public review or hearing unless appeal to an administrative determination involving the underlying project is properly filed:
An act of subdivision not required to be accomplished by long plat, large lot subdivision or short plat;
Land use activity permitted without benefit of conditional use approval (administrative or quasi-judicial), as listed in
KCC Title 17, Zoning;
Minor amendments or modifications to approved developments or permits. Minor amendments are those which may affect the precise dimensions or locations of buildings, accessory structures and driveways, but do not affect the overall project character, increase the number of lots, dwelling units, or density, or decrease the quality or amount of open space;
Building and associated construction permits, including but not limited to mechanical, plumbing, tank and manufactured home placement, etc.;
Sign permit;
Flood development permit;
Critical areas binding determination;
Septic and associated health permits, including vault privy, pool and food handler, etc.;
Well and/or community water system permit;
Approval to access onto county road;
Acts of right-of-way vacation;
Miscellaneous county actions related to use of public areas or facilities; and
Those actions categorically exempt from SEPA review, pursuant to Chapter
15.04 KCC, except as may be required by
KCC 15A.03.060(D). (Ord. 2007-22, 2007; Ord.
2000-07; Ord. 98-10, 1998)
15A.03.090 Review actions on project permit applications. Project review shall include the following steps:
A notice of determination of completeness to the applicant.
A notice of application to the public and agencies with jurisdiction.
No more than one consolidated open record hearing and no more than one closed record appeal.
Provisions may be allowed by the local jurisdiction for any public meeting or required open record hearing that may be held on the project by another local, state, regional, federal, or other agency, in accordance with provisions of Chapter
36.70B RCW.
A single report by a representative of the administrator, stating all the decisions made as of the date of the report on all project permits included in the consolidated permit process. The report shall state any mitigation required or proposed under the development regulations or the agency's authority under
RCW 43.21C.060. The report may be the local permit. If a threshold determination other than a determination of significance has not been issued by Kittitas County, the report shall include or append this determination.
A notice of decision.
Except as otherwise provided for in this title, Kittitas County shall
issue its notice of final decision on a project permit application within
120 days after Kittitas County notifies the applicant that the application
is complete. (Ord. 2000-07; Ord. 98-10, 1998)
15A.03.100 Criteria for review of all project actions. Project review should start from the fundamental land use planning choices made in local comprehensive plans and regulations, include review of consistency and land use impacts.
Applicable comprehensive plans and regulations that identify the type of land use for the site, specify density, and identify and provide for funding of public facilities needed to serve the proposed development and site should be the standard for project review. Consistency should be determined in the project review process by considering four factors found in applicable plans or regulations:
The type of land use permitted at the site, including uses that may be allowed under certain circumstances, such as planned unit developments and conditional uses, if the criteria for their approval have been satisfied;
The level of development allowed, such as units per acre or other measures of density;
Infrastructure, such as the adequacy of public facilities and services identified in the comprehensive plan, to serve the proposed project; and
The character of the proposed development, such as compliance with specific development standards.
In determining consistency, the determinations made pursuant to this title shall be controlling.
Project review should not require additional studies or mitigation under Chapter
43.21C RCW (SEPA) where existing regulations have adequately addressed a proposed project's probable specific adverse environmental impacts.
Supplemental authority as specified by Chapter
43.21C RCW should be used to the extent that existing requirements do not adequately address a project's specific probable adverse environmental impacts.
Nothing in this title limits the authority of a permitting agency to approve, condition, or deny a project as provided in its development regulations adopted under Kittitas County comprehensive plan and development regulations and its policies adopted under
RCW 43.21C.060. Project review shall be used to identify specific project design and conditions relating to the character of the development, such as details of site plans, curb cuts, drainage swales, transportation demand management, or other measures to mitigate a proposal's probable adverse environmental impacts, if applicable.
Consistency between the proposed project and applicable regulations or plan should be determined through a project review process that integrates land use and environmental impact analysis, so that governmental and public review of the proposed project, involving development regulations under Chapter
36.70A RCW, and environmental process under Chapter
43.21C RCW run concurrently and not separately.
During project review, Kittitas County or any subsequent reviewing body shall not reexamine alternatives to or hear appeals on the items identified in such Kittitas County comprehensive plan and development regulation standards, except for issues of code interpretation.
When holding a hearing on a project permit application, the hearing body
should utilize the following issues outlined as a review guide: earth, air,
water (including irrigation water and its conveyances), plants, animals,
energy and natural resources, environmental health, land and shoreline use,
housing, aesthetics, light and glare, recreation, historic and cultural
preservation, transportation, public services, and utilities. (Ord. 2000-07;
Ord. 9810, 1998)
These provisions shall apply to all development applications, except for development applications processed
administratively.
The applicant shall post the subject property with signs as required by Community Development Services.
Signs shall be posted on each road frontage on the subject property and shall be clearly visible and accessible.
Signs shall be posted and on-site prior to issuance of a Notice of Application.
The sign shall be a minimum 2 feet by 3 feet and laminated and posted in a sturdy manner to remain on-site until
fifteen days after the expiration of the notice of decision appeal period. It shall be the responsibility of the applicant to
properly dispose of the sign.
At the time of development application, Community Development Services will identify the number of signs needed and
the general location of each sign on the subject property.
It shall be the responsibility of the applicant to place the structure in which the sign will be posted on-site.
At such time the structure and sign is in place, the applicant shall contact Community Development Services. (Ord.
2007-22, 2007)
Chapter 15A.04
INTEGRATION OF SEPA AND APPEALS OF SEPA ACTIONS
15A.04.010 SEPA integration. The State Environmental Policy Act is not intended to create a cause of action unrelated to a specific governmental action. Kittitas County shall integrate the permit procedures in this title with environmental review under Chapter
43.21C RCW (SEPA) and Chapter
15.04 KCC as follows.
Existing plans, regulations, rules or laws that provide environmental analysis and measures that avoid or otherwise mitigate the probable specific adverse environmental impacts of proposed projects should be integrated with, and should not be duplicated by, environmental review under Chapter
43.21C RCW and Chapter
15.04 KCC.
Through an integrated project review process:
If the applicable regulations require studies that adequately analyze all of the project's specific probable adverse environmental impacts, additional studies under SEPA will not be necessary on those impacts;
If the applicable regulations require measures that adequately address such environmental impacts, additional measures would likewise not be required under SEPA; and
If the applicable regulations do not adequately analyze or address a proposal's specific probable adverse environmental impacts, additional review will be required.
In deciding whether a specific adverse environmental impact has been addressed by an existing rule or law of another agency with jurisdiction with environmental expertise with regard to a specific environmental impact, Kittitas County shall consult orally or in writing with that agency. In making this deferral, Kittitas County shall base or condition its project approval on compliance with these other existing rules or laws.
Nothing in this title limits the authority of an agency in its review or mitigation of a project to adopt or otherwise rely on environmental analyses and requirements under other laws.
Except for a determination of significance, the administrator may not issue his/her threshold determination under SEPA, or issue a decision or a recommendation on a project permit until the expiration of the public comment period on the notice of application, except for categorical exemptions.
Nonsignificant threshold determinations shall be included with or appended to the single report of decision or recommendation.
An environmental impact statement (EIS) shall be prepared on proposals
for legislation and other major actions having a probable significant,
adverse environmental impact. The EIS may be combined with the
recommendation or report on the proposal or issued as a separate document.
The substantive decisions or recommendations shall be clearly identified in
the combined document. (Ord. 2000-07; Ord. 98-10, 1998)
Appeals shall be of the governmental action together with its accompanying environmental determinations. Kittitas County shall consolidate an appeal of procedural issues made under Chapter
43.21C RCW and Chapter
15.04 KCC (such as a decision to require particular mitigation measures or to deny a proposal) with a hearing or appeal on the underlying governmental action by providing for a single simultaneous hearing before one hearing body to consider the agency decision on a proposal and any environmental determinations made, with the exception of the appeal, if any, of a threshold determination of significance.
Appeals of environmental determinations made or lacking under Chapter
43.21C RCW or Chapter
15.04 KCC shall be commenced within 10 working days to the Kittitas County board of commissioners, with appropriate administrative fee. Such appeals shall be filed pursuant to Chapter
15A.07 KCC. The agency shall give official notice stating the date and place for commencing an appeal. If there is no time period for appealing the underlying governmental action, and a notice of action under
RCW 43.21C.080 is used, appeals shall be commenced within the time period specified by
RCW 43.21C.080.
Appeals on SEPA procedures shall be limited to review of a final threshold determination and final EIS. These appeals may occur prior to an agency's final decision on a proposed action. Appeal of the intermediate steps under SEPA (e.g., lead agency determination, scoping, draft EIS adequacy) shall not be allowed.
Kittitas County shall provide for only one administrative appeal of a
threshold determination or of the adequacy of an EIS. Successive
administrative appeals on these issues shall not be allowed. (Ord. 2000-07;
Ord. 9810, 1998)
Notice of any SEPA action taken by a governmental agency may be publicized by the acting governmental agency in substantially the form as set forth in rules adopted under
RCW 43.21C.110:
By publishing notice on the same day of each week for two consecutive weeks in a legal newspaper of record;
By filing notice with the Department of Ecology at its main office in Olympia prior to the date of the last newspaper publication; and
Mailing notice to all parties on the notice of application listing, as defined in Chapter
15A.03 KCC.
Except as otherwise provided in
RCW 43.21C.075(5)(a),
any action to set aside, enjoin, review, or otherwise challenge any such
governmental action or subsequent governmental action for which notice
is given as provided in subsection A of this section on grounds of
noncompliance with the provisions of this title and other laws shall be
commenced within 21 days from the date of last newspaper publication of
the notice pursuant to subsection A of this section, or be barred. (Ord.
2000 07; Ord. 98-10, 1998)
15A.05.010 Hearings. Kittitas County shall hold a public hearing on each application for a project permit if one is so required.
Upon the filing of an application for a development activity as set forth in this title and other laws, the administrator shall, in consultation with the appropriate hearing body chair, set the time and place for a public hearing if one is so required on such a matter, and written notice thereof shall be sent through the United States mail to all parties on the notice of application listing, as defined in Chapter
15A.03 KCC.
Kittitas County may combine any hearings on a project permit with
any hearings that may be held by another local, state, regional,
federal, or other agency; provided, that the hearing is held within the
geographic boundary of the local government. Hearings shall be combined
if requested by an applicant, as long as the joint hearing can be held
within required time periods or the applicant agrees to the schedule in
the event that additional time is needed in order to combine the
hearings. All agencies of the state of Washington, including municipal
corporations and counties participating in a combined hearing shall
issue joint hearing notices and develop a joint format, select a
mutually acceptable hearing body or officer, and take such other actions
as may be necessary to hold joint hearings consistent with each of their
respective statutory obligations. Each government entity shall render
their respective decision according to their statutory obligations.
(Ord. 2000-07; Ord. 9810, 1998)
15A.05.020 Procedures for hearings. Public hearings shall be conducted in accordance with the hearing body's rules of procedure and shall serve to create or supplement an evidentiary record upon which the body will base its decision. The chair shall open the public hearing and, in general, observe the following sequence of events:
Staff presentation, including submittal of any administrative reports. Members of the hearing body may ask questions of the staff.
Applicant presentation, including submittal of any materials. Members of the hearing body may ask questions of the applicant.
Testimony or comments by the public germane to the matter. Questions directed to the staff or the applicant shall be posed by the chair at its discretion.
Rebuttal, response or clarifying statements by the staff and the applicant.
The evidentiary portion of the public hearing shall be closed and
the hearing body shall deliberate on the matter before it. (Ord.
2000-07; Ord. 98-10, 1998)
Sections 15A.06.010 Notice of decision issuance. 15A.06.020 Order to include finding of fact.
15A.06.010 Notice of decision issuance. A notice of decision shall be provided that includes a statement of any threshold determination made under Chapter
43.21C RCW (SEPA) and the procedures for administrative appeal, if any. The notice of decision may be a copy of the report or decision on the project permit application. For projects requiring
Hearing Examiner or Planning Commission review and Board of County Commissioner approval, the notice shall be the signed ordinance or resolution.
Kittitas County shall provide notice of decision in the same manner as the notice of application.
The notice of decision shall be provided to the following persons:
The applicant;
Any person who, prior to the rendering of the decision, specifically requested notice of the decision;
Any person who, prior to the rendering of the decision,
submitted substantive comments on the application. (Ord. 2007-37,
2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.06.020 Order to include finding of fact. Kittitas County shall, in making an order, requirement, decision or
determination, include in a written record of the case the findings of fact upon
which the action is based. (Ord. 2000-07; Ord. 98-10, 1998)
Sections 15A.07.010 Appeal of determination or decision. 15A.07.020 Procedures for closed record appeals. 15A.07.030 Procedures for open record appeals. 15A.07.040 Remand. 15A.07.050 Appeal of decision - Scope of authority.
An appeal of an administrative land use decision shall be filed with the board of county commissioners within 10 working days of the date of the decision.
Appeals shall contain a written, concise statement identifying:
The decision being appealed;
The name and address of the appellant and his interest(s) in the matter;
The specific reasons why the appellant believes the decision to be wrong. The appellant shall bear the burden of proving the decision was wrong;
The desired outcome or changes to the decision;
The appeals fee.
Upon the filing of a timely appeal, the administrator shall, in consultation with the appropriate hearing body chair pursuant to
KCC 15A.01.040, set the time and place at
which the matter will be considered. The officer from whom the appeal is
being taken shall forthwith transmit to the reviewing body all of the
records pertaining to the decision being appealed from, together with
such additional written report as he deems pertinent. (Ord. 2000-07;
Ord. 98-10, 1998)
Closed record appeals shall be conducted in accordance with the hearing body's rules of procedure and shall serve to provide argument and guidance for the body's decision. Closed record appeals shall be conducted generally as provided for public hearings. No new evidence or testimony shall be given or received. The parties to the appeal may submit timely written statements or arguments.
A written decision by the hearing body shall be issued within 60
days of the appeal being filed. (Ord. 2000-07; Ord. 98-10, 1998)
Open record appeals shall be conducted in accordance with the hearing body's rules of procedure and shall serve to provide argument and guidance for the body's decision. Open record appeals shall be conducted generally as provided for public hearings. New evidence or testimony may be given or received.
A written decision by the hearing body shall be issued within 90
days of the appeal being filed. (Ord. 2000-07; Ord. 98-10, 1998)
15A.07.040 Remand. In the event the reviewing body determines that the public hearing
record or record on appeal is insufficient or otherwise flawed, that body may
remand back to the hearing body to correct the deficiencies. The reviewing body
shall specify the items or issues to be considered and the time frame for
completing the additional work. (Ord. 2000-07; Ord. 98-10, 1998)
15A.07.050 Appeal of decision - Scope of authority. In exercising the power granted herein, the reviewing body may, in
conformity with county code, reverse or affirm, wholly or in part, or may modify
the order, requirement, decision or determination appealed from, and may make
such order, requirement, decision or determination as should be made and, to
that end, shall have all the powers of the officer from whom the appeal is
taken, insofar as the decision on the particular issue is concerned. (Ord.
2000-07; Ord. 98-10, 1998)
Proceedings for review shall be commenced by filing a land use petition in superior court. This process shall be the exclusive means of judicial review of land use decisions, except for:
Land use decisions of a local jurisdiction that are subject to review by a quasi-judicial body created by state law, such as the Shorelines Hearings Board or the Growth Management Hearings Board;
Judicial review of applications for a writ of mandamus or prohibition; or
Claims provided by any law for monetary damages or compensation.
The land use petition is timely if it is filed and served on all required parties within 21 days of the issuance of the land use decision pursuant to Chapter
36.70C RCW.
For the purposes of this section, the date on which a land use decision is issued is:
Three days after a written decision is mailed by the local jurisdiction or, if not mailed, the date on which the local jurisdiction provides notice that a written decision is publicly available;
If the land use decision is made by ordinance or resolution by a legislative body sitting in a quasi-judicial capacity, the date the body passes the ordinance or resolution; or
If neither subsection (C)(1) nor (C)(2) applies, the date the decision is entered into the public record.
Standing to bring a land use petition is limited to the following persons:
The applicant and the owner of property to which the land use decision is directed;
Another person aggrieved or adversely affected by the land use decision, or who would be aggrieved or adversely affected by a reversal or modification of the land use decision. A person is aggrieved or adversely affected only when all of the following conditions are present:
The land use decision has prejudiced or is likely to prejudice that person;
That person's asserted interests are among those that the local jurisdiction was required to consider when it made the land use decision;
A judgment in favor of that person would substantially eliminate or redress the prejudice to that person caused or likely to be caused by the land use decision; and
The petitioner has exhausted his or her administrative
remedies to the extent required by law. (Ord. 2000-07; Ord.
98-10, 1998)
For the purposes of this chapter, a planned action means one or more types of project actions that:
Are designated planned actions by an ordinance or resolution adopted by Kittitas County under
RCW 36.70A.040;
Have had the significant impacts adequately addressed in an environmental impact statement prepared in conjunction with a comprehensive plan or subarea plan adopted under Chapter
36.70A RCW, or a fully contained community, a master planned resort, a master planned development, or a phased project;
Are subsequent or implementing projects for the proposals listed in subsection (A)(1) or (A)(2) of this section;
Are located within an urban growth area, as defined in
RCW 36.70A.030;
Are not essential public facilities as defined in
RCW 36.70A.200; and
Are consistent with a comprehensive plan adopted under Chapter
36.70A RCW.
Kittitas County shall limit planned actions to certain types of
development or to specific geographical areas that are less extensive
than the jurisdictional boundaries of the county and may limit a planned
action to a time period identified in the environmental impact statement
or the ordinance or resolution. (Ord. 2000-07; Ord. 98-10, 1998)
15A.09.020 SEPA integration with planned actions. A planned action does not require a threshold determination under Chapter
43.21C RCW and Chapter
15.04 KCC, or the preparation of an environmental
impact statement, but is subject to environmental review and mitigation. (Ord.
2000-07; Ord. 98-10, 1998)
Sections 15A.10.010 Continual evaluation. 15A.10.020 Review procedure. 15A.10.030 Deficiencies during project permit review. 15A.10.040 Public participation program for amendments.
15A.10.010 Continual evaluation. The Kittitas County comprehensive plan, elements thereof, and
development regulations shall be subject to continuing evaluation and review by
Kittitas County. (Ord. 2000-07; Ord. 98-10, 1998)
15A.10.020 Review procedure. Nonproject legislative actions, including but not limited to the adoption and amendment of the comprehensive plan and development regulations, are exempt from the procedural requirements of this title. The procedures for nonproject legislative actions are provided for in
KCC Title 15B. (Ord. 2000-07; Ord. 98-10, 1998)
15A.10.030 Deficiencies during project permit review. If, during project permit review, Kittitas County identifies deficiencies in county plans or regulations, the project permit review shall continue, and the identified deficiencies shall be docketed for possible future amendments pursuant to
KCC Title 15B. For purposes of this section, a
deficiency in a comprehensive plan or development regulation refers to the
absence of required or potentially desirable contents of a comprehensive plan or
development regulation. It does not refer to whether a development regulation
addresses a project's probable specific adverse environmental impacts which the
permitting agency could mitigate in the normal project review process. (Ord.
2000-07; Ord. 98-10, 1998)
15A.10.040 Public participation program for amendments. Any interested person, including applicants, citizens, county commission and board members, and staff of other agencies may suggest plan or development regulation amendments. The suggested amendments shall be docketed with the
Community Development Services department and considered by Kittitas County planning commission and board of county commissioners on at least an annual basis pursuant to
KCC Title 15B, consistent with the provisions of
RCW 36.70A.130.
(Ord. 2007-22, 2007; Ord. 2000-07; Ord. 98-10, 1998)
15A.11.010 Development agreements. Kittitas County may enter into development agreements pursuant to
RCW 36.70B.170 through
36.70B.210.
A decision to enter into a development agreement shall be made on a case-by-case
basis. A development agreement may be appropriate for large, complex or phased
projects, or projects which were not contemplated by existing development
regulations or existing application procedures. A development agreement may
include provisions which are different or in addition to other county
development regulations, as long as impacts are mitigated. (Ord. 2000-07; Ord.
9810, 1998)
Kittitas County may enter into a development agreement with a person having ownership or control of real property within the county's jurisdiction.
A development agreement must set forth the development standards and other provisions that shall apply to and govern and vest the development, use and mitigation of the development of the real property for the duration specified in the agreement.
A development agreement shall be consistent with applicable county development regulations, except as such development regulations have been modified by the development standards contained in the agreement.
A development agreement does not affect the validity of a contract rezone, concomitant agreement, annexation agreement, or other agreement in existence on July 23, 1995, or adopted under separate authority, that includes some or all of the development standards provided in subsection E of this section.
For purposes of this chapter, "development standards" include, but are not limited to:
Project elements such as permitted uses, residential densities, and nonresidential densities and intensities or building sizes;
Mitigation measures, development conditions, and other requirements under Chapter
43.21C RCW;
Design standards such as maximum heights, setbacks, drainage and water quality requirements, landscaping, and other development features;
Road and sidewalk standards;
Affordable housing;
Water, sewer, storm drainage and other infrastructure requirements;
Parks and open space preservation;
Phasing;
Development review processes, procedures and standards for implementing decisions, including methods of reimbursement to the county for review processes;
A build-out or vesting period for applicable development standards;
Process for amending the development agreement; and
Any other appropriate development requirement or procedure.
A development agreement may obligate a party to fund or provide
services, infrastructure, or other facilities. Project applicants and
local governments may include provisions and agreements whereby
applicants are reimbursed over time for financing public facilities. A
development agreement shall reserve authority to impose new or different
regulations to the extent required by a serious threat to public health
and safety. (Ord. 2000-07; Ord. 98-10, 1998)
15A.11.030 Request for development agreement. A project applicant may submit a request for a development agreement to Kittitas County. The request should describe the project and the specific reasons why the project is suitable for a development agreement. The request should identify the development standards set forth in
KCC 15A.11.020(E) that the applicant is requesting be included in the development agreement and any other reasonable information requested by the county. The request shall be filed with the planning office upon forms prescribed for that purpose by the administrator. The fee for such request shall be established pursuant to
KCC 15A.03.050. (Ord. 2000-07; Ord. 98-10, 1998)
15A.11.040 Effect. Unless amended or terminated, a development agreement is enforceable
during its term by a party to the agreement. A development agreement and the
development standards in the agreement govern during the term of the agreement,
or for all or that part of the built-out period specified in the agreement, and
may not be subject to an amendment to a zoning ordinance or development standard
or regulation adopted after the effective date of the agreement. A permit or
approval issued by Kittitas County after the execution of the development
agreement must be consistent with the development agreement. (Ord. 2000-07; Ord.
98-10, 1998)
15A.11.050 Recording parties and successors bound. A development agreement affecting property in Kittitas County shall be
recorded with the real property documents of Kittitas County. During the term of
the development agreement, the agreement is binding on the parties, their
successors and assigns, including any city that assumes jurisdiction through
incorporation or annexation of the area covering the property subject to the
development agreement. (Ord. 2000-07; Ord. 98-10, 1998)
15A.11.060 Public hearing. The county shall only approve a development agreement by ordinance or resolution after a public hearing. The county legislative body, or other body designated by the legislative body to conduct the public hearing, may conduct the hearing. If the development agreement relates to a project permit application, the provisions of Chapter
36.70C RCW
shall apply to the appeal of the decision on the development agreement. (Ord.
2000-07; Ord. 98-10, 1998)
15A.11.070 Nothing in
RCW 36.70B.170 through
36.70B.200
and Section 501, Ch. 374, Laws of 1995, or this chapter is intended to authorize
the county to impose impact fees, inspection fees, or dedications or to require
any other financial contributions or mitigation measures except as expressly
authorized by other applicable provisions of state law. (Ord. 2000-07; Ord.
98-10, 1998)
15A.12.010 State permit coordination. Kittitas County may enter into coordinated permitting process with state and local permitting agencies pursuant to Chapter
90.60 RCW
upon a case-by-case basis. Such decision to enter into a coordinated permitting
process with other state and local agencies shall be made by the administrator
on a case-by-case basis. (Ord. 2000-07; Ord. 98-10, 1998)
15A.13.010 Purpose.
Site plan review is an evaluation of development plans to identify compliance
with applicable regulations, requirements and standards; to ensure that the
proposal is coordinated with known and planned development on adjacent sites and
within the subarea; to determine whether roads, access, capital facilities and
utilities are adequate to serve the proposed development; and to ensure that
development will protect the health, safety and general welfare of County
residents. (Ord. 2009-25, 2009)
15A.13.020 Applicability.
Site plan review and approval is required prior to the development, occupancy or
use of any site within the Snoqualmie Subarea. Site plan review shall apply to
all new development, redevelopment, expansion or site improvements that will
change the physical conditions of a site and is required prior to issuance of
building permit. Site plan review is not intended to review and determine the
appropriateness of a given use on a particular site. (Ord. 2009-25, 2009)
The process for review of a site plan shall be as follows:
Review of proposals that are consistent with the applicable land use designation in the Comprehensive Plan and Snoqualmie Pass Subarea Plan, and with the applicable zoning designation shall be processed as an administrative decision and shall be determined by the Director of Community Development Services pursuant to
KCC 15A.07.
Review for proposals that also require preliminary subdivision approval or zoning reclassification shall be heard and decided by the Hearing Examiner, consistent with the procedures rezones specified in
KCC 15A.03.
Site plan review may be conducted independently or concurrently with any other development approval or permit required by this title.
Preapplication conference. A preapplication conference between the applicant and County staff is optional but is recommended. Refer to
KCC 15A.03.020.
Application Requirements. An application for site plan review shall include the following:
Narrative description of the proposal including: (a) site size, building size, and impervious surface coverage, and amount of area devoted to open space and recreation, landscaping and parking; calculations of gross and net density (b) designations of the property in the Comprehensive Plan, Snoqualmie Subarea Plan and zoning; (c) elevations and perspective drawings of proposed structures and other proposed improvements; (d) any agreements, covenants or other provisions that affect the proposal; and (e) signatures, mailing addresses and phone numbers of all owners of record or agents of the subject property.
Vicinity map, showing site boundaries and existing roads and accesses within and bounding the site;
Site plans, drawn to a scale no less than one inch equals fifty feet, showing the location and size of uses, buffer and open space areas, landscaped areas, areas of disturbance outside building footprints, and any existing structures, easements and utilities;
Topographic map, based on a site survey, delineating existing contours at no less that 5-foot intervals, and which locates existing streams, wetlands and other natural features;
Conceptual landscape plan;
Parking and circulation plan;
Preliminary stormwater management plan;
Preliminary utilities plan;
Other reports or studies as determined applicable by the Director, including but not limited to geotechnical, critical areas, and/or traffic;
SEPA environmental checklist unless the proposal is categorically exempt per KCC 15.04, Environmental Policy, or the applicant has agreed to prepare an environmental impact statement;
A list of the names and addresses of property owners of record within 500 feet of the project boundaries.
The Director of Community Development Services may modify these requirements based on the size, scope and complexity of the proposal.
Review and processing of applications for site plan review shall follow the procedures for review of other project permits as specified in
KCC 15A.03. (Ord. 2009-25, 2009)
15A.13.040 Criteria for approval.
To be approved, or approved with conditions, a site plan must be consistent with the County's Comprehensive Plan and the Snoqualmie Pass Subarea Plan, and with all applicable development regulations, codes and other County requirements. A proposed site plan shall also satisfy the criteria of
KCC 17.60B.050. (Ord. 2009-25, 2009)
15A.13.050 Amendments to approved site plans.
Proposed alterations to an approved site plan shall be processed consistent with KCC
17.36.070. (Ord. 2009-25, 2009)
15A.13.060 Appeals of site plan determinations.
Appeals of decisions on site plans shall follow the procedures of
KCC 15A.07. (Ord. 2009-25, 2009)
1 See KCC 15A.01.040 for clarification of roles and responsibilities.
2 Open record appeals of SEPA actions are heard by the hearing body making the decision on, or hearing the appeal of, the underlying application.
3 BOA for all actions associated with a project before them, all independent actions regarding
KCC Title 17, Zoning; BCC for all actions associated with a project before them, and for independent actions regarding all county policies, codes, and standards not associated with
KCC Title 17, Zoning.
4 Unless the rezone requires a comprehensive plan amendment which would then follow the comprehensive plan amendment process as outlined in
KCC Title 15B.
5 In the event that a procedural appeal is filed pursuant to Chapter
15A.04 KCC, the BOA shall consider and issue a final decision on both the administrative appeal and the underlying project permit application under a single consolidated open record hearing. In such an event, the BOA's decision on the underlying application shall be quasi-judicial.
Legend:
BCC - Board of County Commissioners
BOA - Board of Adjustment
HE - Hearing Examiner
PC - Planning Commission
Staff - County administration
NOTE: In the case of combined applications which require public hearings before the planning commission and the board of adjustment, a joint hearing shall be held, and the board of adjustment decision shall be final and the planning commission recommendation transmitted to the board of commissioners for decision.
NOTE: In the case of application requiring combined legislative and quasi-judicial actions, a development agreement may provide for appropriate review and hearing body.
* Please review state revised and administrative code for appropriate judicial reviewing bodies.
Disclaimer: This web site is provided for informational purposes
only. Although every effort has been made to provide accuracy, all
information and resources shown are not official. Neither Kittitas
County nor any of its agencies, officials or employees guarantees
the accuracy of any information on this web site. Reliance upon the
information contained on or accessed through this web site is
entirely at your own risk. Kittitas County reserves the right to
make changes without notice. The official hard copy is available in the Commissioners' office.